|
Infrastructure Budget savings 11 March 2011 The Department of Infrastructure has described how it has achieved significant savings over the past two years. Minister for Infrastructure Phil Gawne MHK explained this has been achieved by only replacing vacancies that are essential, by reducing operating costs across the Department and by reducing Highways improvement budgets, also many of the operational changes to achieve the planned budget reductions in 2011-12 have already been made in 2010-11. The Department is budgeted to save £2.9m on a net budget of £37.6m, a net reduction of 7.7% Within Operations Division: Over 38 vacancies not replaced in three years. Restructured operating practices saving in excess of £300,000 in plant hire costs. Increased focus on winning private sector work where a competitive market does not exist on the IOM, Circ £200k income and growing. 1.5 directors posts eliminated and rationalised in to Operations with the integration of Design Services and DoLGE functions Restructuring of management team to focus on delivery of core competencies. Creation of Technical Services (from within the existing work force) to focus on the maintenance of Governments growing inventory of technically complex equipment. Restructuring of the pricing structure to bring clarity to the real costs of work and emergency response equipment. Leading to efficiency improvements in excess of £500k reflected in reduced material costs. Absorption of DoLGE vehicle fleet into the existing maintenance and management capacity. Progressively improving delivery efficiency by helping clients plan their work load better. Trials of new working practices with the potential to cut delivery time by 75% without increased cost. Operational savings in waste management achieved during the past year £500k Increases in Waste charges £140k Airport savings 2011-12 :- Energy savings (£25k) more efficient use of resource plus better lighting systems, for example the airfield lighting system and all external lighting. General repairs/maintenance (£65k) A more cost effective contract for annual flight checks, better airfield maintenance regime, general savings on airfield maintenance due to better paved surfaces General airport expenditure (£25k) better deal on airfield insurance and general savings on advertising, stationery and cleaning costs General expenses (£30k) training (less high cost training eg Air traffic control) and travel/subsistence etc Car parking/rental income to increase by inflation raising ca £10k Harbours savings 2011-12:- Reduction in maintenance costs of £100k Saving in Passenger security contract of £100k Increased levels of income arising from higher Harbour Dues and volume growth at marinas and boat parks £450k Highways planned reductions for 2011-12 A reduction of £30,000 in gully cleansing . A reduction in £150,000 street cleansing A 5% increase in vehicle duty which will generate £400,000 in additional income The key savings above amount to £4.2m. The Department is also working towards a 10% reduction in energy usage and is leading the delivery of the Government office accommodation policy which is designed to free up accommodation and reduce the overall cost of accommodation to Government. Phil Gawne continued
. The Department of Infrastructure will continue to ensure that it provides essential services to a high standard while seeking every opportunity to improve its effectiveness. More stories >>> |